Monday, August 18, 2014

Software Testing Questions and Answers

Software Testing Questions and Answers

Find the answers at the end of the questions.
1) The approach/document used to make sure all the requirements are covered when writing test cases
a) Test Matrix b) Checklist c) Test bed d) Traceability Matrix

2) Executing the same test case by giving the number of inputs on same build called as
 a) Regression Testing b) Re - Testing c) Ad hoc Testing d) Sanity Testing

3) Control Charts is a statistical technique to assess, monitor, and maintain the stability of a process.
 a) True b) False

4) To check whether we are developing the right product according to the customer requirements are not. It is a static process 
a) Validation b) Verification c) Quality Assurance d) Quality Control

5) To check whether we have developed the product according to the customer requirements r not. It is a Dynamic process.
a) Validation b) Verification c) Quality Assurance d) Quality Control

6) Staff development plan describes how the skills and experience of the project team members will be developed. 
a) True b) False

7) It is a set of levels that defines a testing maturity hierarchy 
a) TIM (Testing Improving Model) b) TMM (Testing Maturity Model) c) TQM(Total Quality Management)

8) A Non-Functional Software testing done to check if the user interface is easy to use and understand 
a) Usability Testing b) Security Testing c) Unit testing d) Block Box Testing

9) The review and approved document (i.e. Test plan, System Requirement Specification’s) is called as 
a) Delivery Document b) Baseline Document c) Checklist

10) What are the Testing Levels? 
a) Unit Testing b) Integration Testing c) System Testing and Acceptance Testing d) All the above

11) Cost of quality = Prevention Cost + Appraisal cost + Failure cost 
a) True b) False

12) A useful tool to visualize, clarify, link, identify, and classify possible cause of a problem. This is also called as “fishbone diagram” what is this? 
a) Pareto Analysis b) Cause-and-Effect Diagram

13) It measures the quality of processes used to create a quality product.
It is a system of management activities,
It is a preventive process, It applies for entire life cycle & Deals with Process. 
a) Validation b) Verification c) Quality Assurance d) Quality Control

14) Variance from product specifications is called? 
a) Report b) Requirement c) Defect

15) Verification is
a) Process based b) Product based

16) White box testing is not called as___________
a) Glass box testing b) Closed box testing c) Open box testing d) Clear box testing

17) Name the events that will be analyzed, Count the named incidents, Rank the count by frequency using a bar chart & Validate reasonableness of the analysis is called as
a) Pareto Analysis b) Cause and Effect Diagram c) SWOT Analysis d) Pie Charts

18) Retesting of a single program or component after a change has been made? 
a) Full Regression Testing b) Unit Regression c) Regional Regression d) Retesting

19) Requirement and Analysis, Design, Development or Coding, Testing and Maintenance is called as Software Development Life Cycle (SDLC) 
a) True b) False

20) The testing which is done by going thro’ the code is known as,
a) Unit testing b) Black box testing c) White box Testing d) Regression testing

21) Configuration Management Plan describes the Configuration Management procedures and structures to be used. 
a) True b) False

22) This type of testing method attempts to find incorrect or missing functions, errors in data structures or external database access, interface errors, Performance errors and initialization and Termination errors. It is called as 
a) White Box Testing b) Grey Box Testing c) Black Box Testing d) Open Box Testing

23) Phase Definition. It will come under 
a) CMM Level 1 b) CMM Level 2 c) None

24) Software testing which is done without planning and Documentation is known as
a) Ad Hoc Testing b) Unit Testing c) Regression testing d) Functional testing.

25) Acceptance testing is known as
a) Beta Testing b) Grey - box testing c) Test Automation d) White box testing

26) Retesting the entire application after a change has been made called as? 
a) Full Regression Testing b) Unit Regression c) Regional Regression d) Retesting

27) Boundary value analysis belongs to which testing method?
a) Black Box testing b) White Box testing

28) It measures the quality of a product
It is a specific part of the QA procedure; It is a corrective process,
It applies for particular product & Deals with the product. 
a) Validation b) Verification c) Quality Assurance d) Quality Control

29) What are the Types of Integration Testing? 
a) Big Bang Testing b) Bottom Up Testing c) Top Down Testing d) All the above

30) Product Risk affects The quality or performance of the software. 
a) True b) False

31) A metric used to measure the characteristic of documentation and code called as 
a) Process metric b) Product Metric c) Test metrics

32) Which is non-functional software testing?
a) Unit Testing b) Block box testing c) Performance Testing d) Regression

33) The process that deals with the technical and management issues of software development called as? 
a) Delivery Process b) Testing Process c) Software Process

34) Executing the same test case on a modified build called as 
a) Regression testing b) Retesting c) Ad hoc Testing d) Sanity Testing

35) Which is Black-Box Testing method?
a) Equivalence partitioning b) code coverage c) fault injection

36) Business Risk affects The Organization developing or Procuring the software. 
a) True b) False

37) Stratification is a Technique used to analyze/divide a universe of data into homogeneous groups (strata).
 a) True b) False

38) Automation Testing should be done before starting manual testing.
Is the above statement correct?
a) Yes b) No

39) Earlier a defect is found the cheaper it is to fix it.
Is the above statement correct? 
a) Yes b) No

40) Informing to the developer which bug to be fix first is called as 
a) Severity b) Priority c) Fix ability d) Traceability

41) Software Testing is a process of evaluating a system by manual or automatic means and verify that it satisfies specified requirements or identity differences between expected and actual results. 
a) True b) False

42) Retesting modules connected to the program or component after a change has been made? 
a) Full Regression Testing b) Unit Regression c) Regional Regression d) Retesting

43) An Important metric is the number of defects found in internal testing compared to the defects found in customer tests, Status of test activities against the plan, Test coverage achieved so far, comes under
a) Process Metric b) Product Metric c) Test Metric

44) Alpha testing will be done at,
a) User’s site b) Developers’ site

45) SPICE Means 
a) Software Process Improvement and Capability Determination 
b) Software Process Improvement and Compatibility Determination
c) Software Process Invention and Compatibility Determination
d) Software Process Improvement and Control Determination

46) Requirements Specification, Planning, Test case Design, Execution,
Bug Reporting & Maintenance This Life Cycle comes Under
a) SDLC b) STLC c) SQLC d) BLC

47) It provides a set of levels and an assessment model, and presents a set of recommended practices that allow organizations to improve their testing processes. 
a) TIM (Testing Improving Model) b) TMM (Testing Maturity Model) c) TQM(Total Quality Management)

48) Standards and procedures for managing changes in an evolving software product is called? 
a) Confirmation Management b) Confederation Management c) Configuration Management d) Comparability Management

49) Path Tested = Number of Path Tested / Total Number of Paths 
a) True b) False

50) This Testing Technique examines the basic program structure and it derives the test data from the program logic; Ensuring that all statements and conditions executed at least once. It is called as 
a) Block Box Testing b) White Box Testing c) Grey Box Testing d) Closed Box Testing

51) This type of test includes, how well the user will be able to understand and interact with the system? 
a) Usability Testing b) User Acceptance Testing c) Alpha Testing d) Beta Testing.

52) Defects generally fall into the following categories? 
a) WRONG b) MISSING c) EXTRA d) All the above

53) What is correct Software Process Cycle? 
a) Plan(P)——>Check(C)——>Act(A)—–>Do(D) 
b) Plan(P)——>Do(D)——>Check(C)—–>Act(A)
c) Plan(P)——>Do(D)——>Act(A)—–>Check(C)

54) Conducted to validate that the application, database, and network they may be running on can handle projected volumes of users and data effectively. The test is conducted jointly by developers, testers, DBA’s and network associates after the system Testing called as
a) Functional Testing b) Stress/Load Testing c) Recovery Testing d) Integration Testing

55) Maintenance Plan predicts the maintenance requirements of the system; maintenance costs and effort required 
a) True b) False

56) Beta testing will be done by
a) Developer b) User c) Tester

57) Validation plan describes the approach, resources and schedule used for system validation 
a) True b) False

58) Integration, It will come under 
a) CMM Level 1 b) CMM Level 3 c) CMM Level 2 d) None

59) Types of quality tools are Problem Identification Tools and Problem Analysis Tools.
a) True b) False

60) Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself
a) Water Falls model b) Spiral Model c) V-model d) Linear model

61) A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as 
a) Process metric b) Product Metric c) Test metrics

62) Check Sheet (Checklist) is considered a simple, but powerful statistical tool because it differentiates between two extremes.
a) True b) False

63) Application should be stable. Clear Design and Flow of the application is needed for Automation testing. 
a) False b) True

64) Quality plan describes the quality procedures and standards that will be used in a project.
a) False b) True

65) How severely the bug is effecting the application is called as
a) Severity b) Priority c) Fix ability d) Traceability

66) Project Risk affects The Schedule or Resources. 
a) True b) False

67) The name of the testing which is done to make sure the existing features are not affected by new changes
a) Recursive testing b) White box testing c) Unit testing d) Regression testing

68) Management and Measurement, It will come under 
a) CMM Level 1 b) CMM Level 3 c) CMM Level 4 d) CMM Level 2

69) Ad Hoc testing is a part of
a) Unit Testing b) Regression Tesing c) Exploratory Testing d) Performance Testing

70) Cost of Production = Right the First time cost (RTF) + Cost of Quality. 
a) True b) False

71) ————- means under what test environment (Hardware, software set up) the application will run smoothly 
a) Test Bed b) Checkpoint c) Code Walk through d) Checklist

72) TQM represents
a) Tool Quality Management b) Test Quality Manager c) Total Quality Management d) Total Quality Manager

73) Optimization, Defect Prevention, and Quality Control. It’s come under the 
a) CMM Level 2 b) CMM Level 3 c) CMM Level 4 d) CMM Level5

74) Unit testing will be done by
a) Testers b) End Users c) Customer d) Developers

75) Beta testing will be done at
a) User place b) Developers place

76) A Plan to overcome the risk called as 
a) Migration Plan b) Master plan c) Maintenance plan d) Mitigation Plan

77) Splitting project into tasks and estimate time and resources required to complete each task called as Project Scheduling
a) True b) False


Answers

(1) d (2) b (3) a (4) b (5) a (6) a (7) b (8) a (9) b (10) d (11) a (12) b (13) c (14) c (15) a (16) b (17) a (18) b (19) a (20) c (21) a (22) c (23) b (24) a (25) a (26) a (27) a (28) d (29) d (30) a (31) b (32) c (33) c (34) a (35) a (36) a (37) a (38) b (39) a (40) b (41) a (42) c (43) c (44) b (45) a (46) b (47) a (48) c (49) a (50) b (51) a (52) d (53) b (54) b (55) a (56) b (57) a (58) b (59) a (60) c (61) a (62) a (63) b (64) b (65) a (66) a (67) d (68) c (69) c (70) a (71) a (72) c (73) d (74) d (75) a (76) d (77) a